Create a quota report schedule

You can configure quota report settings to generate the quota report on a specified schedule.

About this task

These settings determine whether and when scheduled reports are generated, and where and how the reports are stored. If you disable a scheduled report, you can still run unscheduled reports at any time.

Procedure

  1. Click File System > SmartQuotas > Settings.
  2. Optional: On the Quota Settings page, in the Scheduled Reporting area, select Scheduled.

    The schedule panel appears.

  3. In the schedule panel, select the report frequency and reporting schedule options that you want to set.
  4. Click Save Changes.

Results

Reports are generated according to the scheduling criteria and can be viewed by clicking File System > SmartQuotas > Generated Reports Archive.